FedEx Winnemucca

Project Summary

This 7,000 sq. ft. regional distribution facility was designed as a customized, design-build project. The project was completed within the scheduled four month time frame.

Building Materials: Pre-engineered metal structure

Project Delivery Method: Construction Manager/General Contractor

Location: Winnemucca, Nevada